2. Valley Electric Company generates electrical power at four coal-fired power plant in Pennsylvania, West Virginia, Kentucky and Virginia. The company purchases coal from six producers in southwestern Virginia, West Virginia and Kentucky. Valley Electric has fixed contracts for coal delivery from the following three coal producers:
Added by Dawn R.
Close
Step 1
Here's a step-by-step approach to understanding and potentially solving any related issues: Show more…
Show all steps
Your feedback will help us improve your experience
Adi S and 56 other Microeconomics educators are ready to help you.
Ask a new question
Labs
Want to see this concept in action?
Explore this concept interactively to see how it behaves as you change inputs.
Key Concepts
Recommended Videos
New Power Plant LCOE [17 points] UE Power, Ltd. has been contracted to construct a new power plant, and they have tapped you to do a cursory economic analysis to help narrow down the designs. They want to be able to deliver low-cost power to their customers. Design 1 is a coal power plant with a nameplate capacity of 500 MW and an expected capacity factor of 56%. The overall efficiency of the plant is expected to be 35%. The capital cost is $3,000/kW, and the yearly non-fuel O&M cost is $25,000,000. Design 2 is a combined cycle gas power plant with a nameplate capacity of 500 MW and an expected capacity factor of 56%. The overall efficiency of the plant is expected to be 55%. The capital cost is $700/kW, and the yearly non-fuel O&M cost is $12,000,000. UE Power has a gas delivery contract at $3/MMBtu and a coal delivery contract at $1/MMBtu for the next 20 years. You are to calculate the LCOE assuming a 20-year lifetime and a discount rate of 8%. What is the total annual generation for each plant in MWh? [1 pt] How much coal will Design 1 use, and how much gas will Design 2 use? (answer in MMBtu/yr and dollars/yr) [4 pts] What is the total annual O&M + fuel cost for each design ($/yr)? [2 pts] What is the capital cost ($) for each power plant? [2 pts] What is the annualized capital cost ($/year) for each power plant? [2 pts] What is the Levelized Cost of Energy for each power plant ($/MWh)? [4 pts] Based on LCOE, which power plant design do you recommend? Briefly describe the technical characteristics of the plant that allow it a lower LCOE. [2 pts]
Adi S.
A trucking company has a contract to move 115 truckloads of sand per week between three sand-washing plants W, X and Y, and three destinations, A, B and C. Cost and volume information is given below. Compute the optimal transportation cost.
Jon S.
Recommended Textbooks
Principles of Economics
Principles of Microeconomics for AP® Courses
Economics
Watch the video solution with this free unlock.
EMAIL