A process requires a conveyor to index cans 2.0 inches in 0.15 seconds and dwell while a cover is pressed onto the can. The cap head must travel 3.0 inches to approach the can. The entire cover pressing stroke should take 0.25 seconds. Determine the time ratio, Q, and crank speed, W, of the mechanism. Estimate the peak velocity and acceleration of the different motion elements. Sketch the synchronized timing charts of the conveyor and the press.