a) Develop a five-bus 2-machine 132kV system of Fig. A (Refer to Annex 1 for how to develop a multi-bus system in PowerWorld).
b) Examine the fault levels at different buses.
c) With a fault occurred on bus F, examine the fault flows in all the circuits and the infeeds from the two generators.
d) Countercheck b) & c) results using a hand calculator.
e) If G or circuit BC is at outage, how would it affect b.
Table A1: System impedance pu. on 100MVA base
Generator nd GA GB * Circuit pu AB 0.1 AC 0.2 BC 0.125 BD 0.25 BF 0.333 CF 0.5 DF 0.167 to be assigned
B
D
Fig. A: 5-bus system