A solar energy project is expected to have capital costs of $995,000, average yearly operating costs of $175,000, and a lifetime of 25 years. If the total production during the lifetime of the project is 89,500,000 kWh, what is the levelized cost of energy (LCOE)? (LCOE = capital costs + average yearly operating costs x number of project years / total production) (I am getting 0.327 which is not an option.)
A. $0.60 per kWh
B. $0.77 per kWh
C. $0.06 per kWh
D. $0.07 per kWh