A thin film coat of fresh paint has been sprayed over a 1.5 m length of a drying chamber. Q3.(20marks) The paint contains benzene as the solvent and needs to be evaporated. The surface of the inside the chamber is 60 m3/min. The width and height of the chamber are 1.5 m and 1 m, respectively. Total pressure of the system is 1 atm. Find the evaporation rate of the solvent benzene in g/s. The following correlation is available: Sh=0.664 Re^0.5 Sc^0.33 Drying chamber 60 m/min air W=1.5m H=1.0m 27C,1.0atm Painted steel plate L=1.5m