13 KVA load 4.5 KVA Schedule 3 SPARE load 53 KVA load 2.5 KVA load 8 Panel D2 72 KVA load [1.5 KVA load 8 9 SPARE SPARE 10 120/240 V 11 SPARE SPARE 12 13 SPARE SPARE 14 3O,4W
Refer to the panel schedule shown above. The nominal voltage between the breaker in space 1 and the breaker in space 8 is volts.