Text: force.
Stand 1 2 3 4 5 30 17.7 10.7 6.6 4.1 m/s 2.6 m/s + ? ? 4 +
3.Rolling Velocities (20 pts a.Using the following figure ? ? 0.26 + 0.34 0.56 0.90 calculate the strip velocity Take-up .25mm after each roll stand if the reel Pay-off initial velocity is reduced reel to 2.0 m/s. Stand 4 Stand 5 b. Calculate the required roll velocity for the work rolls at each roll stand in order 1.45 mm 2.25 mm 0.90mm to maintain a forward slip of zero.(use the velocities for the strip shown in the figure)