The material cost per unit is $2, so the total material cost for 700 shoes is 700 * $2 = $1400.
The labor cost per unit is φ, so the total labor cost for 700 shoes is 700 * φ.
Since the rent is zero, the total cost for producing 700 shoes is the sum of the
Show more…