00:01
Here is the part program to drill the holes in the part in the given figure.
00:07
So let's see this.
00:08
That is o001.
00:12
This is program number.
00:17
The next is n10, g54.
00:25
This is g.
00:27
So this is the work coordinate system.
00:31
The next is n020, g90, g14 and g80.
00:51
This is absolute positioning.
01:03
The next is n030, t01 and m06.
01:17
This is tool change.
01:25
The next is n040 and s1000 and m03.
01:33
So this is spindle speed and direction.
01:41
The next is n050, g43, h01, z5 .0 and m08.
01:59
So this is the tool length, compensation and coolant ton.
02:08
So the next is, it is the complete code.
02:14
So the next is n060, x25 .0 and 540 .0.
02:28
So this is the rapid positioning of first hole.
02:36
This is for first hole.
02:37
And the n070, z81, r2 .0 and z is 12 .0 and the f is 0 .06.
02:57
So this is our drilling cycle...