Initial conditions:
The furniture manufacturing company produces two types of furniture series - "London" and "Paris". The production process takes place in carpentry, varnishing and packaging workshops. In the carpentry workshop "London" is prepared for 4 hours, but the "Paris" is processed for 3 hours, in the varnishing workshop "London" is processed for one and a half hours, but the "Paris" is processed for 3 hours, and at the packaging workshop one "London" is packed in 20 minutes,*Paris" is packed in 40 minutes. 480 hours are available in carpentry, 300 hours in a varnishing workshop and 100 hours in a packing workshop. The company can make a profit of € 45 for one "London" and € 43
for one "Paris".
Initial conditions: x1 - "London" on horizontal axis, x2- "Paris" on vertical axis
Note: If You use hours in the model: 20 min= 0.333333 hours. Alternative: use minutes in the model.
Question: Which line is the the constraint of the carpentry workshop? (Select the most appropriate answer.) O a. x1-x2
Ob. the objective function is negative
Oc. straight line B (blue)
Od. straight line D (blue)
O e. not given at all
Of. x1+x2
O g. x1*x2
Oh. straight line A (blue)
Oi. straight line C (red)