Reliability Engineering
Availability
Maintenance
Cost
RBD
Block Diagram
A reliability block diagram design has the following reliability elements and costs:
R1: 0.998, $4
R2: 0.977, $2
R3: 0.956, $3
At least one block each is needed for the system design, but more than one can be used in parallel.
Select the optimal system of blocks while staying under $15.
What is the total cost of the system (design + maintenance) if maintenance is calculated by ($200 * system unreliability)?