Texts: 1AP10.8
AP10.8 The Manutec robot has large inertia and arm length resulting in a challenging control problem, as shown in Figure AP10.8(a). The block diagram model of the system is shown in Figure AP10.8(b). The percentage overshoot for a step input should be P.O. 20% with a rise time of T_s and a settling time (with a 2% criterion) of T_1.2s. Also, we desire that for a ramp input K, 10. Determine a suitable phase-lead compensator.
250
+2Xr+40+45
FIGURE AP10.8(a) Manutec robot w.ep x
(h)