company could extract from the river? the turbine at 0.38 m/s to meet environmental regulations. The overall volumetric flow through the water falls a height of 20 m, and then would pass through the turbine. The water would need to exit power. At the site they are interested in, the river upstream of the plant flows at 1.1 m/s. The Quebec. In order for the project to be economic, they would need the turbine to output 2.5 MW of