• Home
  • Southern New Hampshire University
  • Managing Quality OL324
  • Managing Quality - DMAIC Process

Managing Quality - DMAIC Process

6-2 Case Study 3: The DMAIC Process Ashely Bigley OL-324-J5879 Managing Quality 22EW5 June 8, 2022 Stephen Schroeder Introduction While working for Cobalt Boats, an opportunity for process improvement presented itself. In this company, there were multiple locations in the town of Neodesha, KS. While not a large town, on person was employed as a driver to collect components from the satellite locations and bring them to the main plant for use. One such location was the metal shop. When fabricating a fiberglass boat, it is necessary to laminate aluminum tapping plates into the layers of fiberglass in places where hardware and components will be attached to the boat to prevent the fiberglass from breaking. These tapping plates of assorted sizes for different applications and locations on the boat were provided to the main plant by the metal shop. The tapping plates were set up on a min max in the warehouse at the main plant. There were over 25 different thicknesses and sizes of tapping plates that were used across 15 models of boats. Frequent stock outs requiring emergency orders to be cut by the metal shop and causing delays in fiberglass had become an issue. Define In the phase of initiating the project, I identified key stakeholders of the process. Representatives from fiberglass, warehouse, metals shop, the driver and myself formed a cross functional team. The goal of this team was to eliminate stock outs of tapping plates in the main plant. The outputs of this step are the project charter, the project team, and a list of clear customer requirements (Goetsch, D. L., & Davis, S, 2020). While defining the current process, additional issues came to our attention. There were tapping plates in the warehouse which were sizes no longer used that were on an aged inventory report. There were also instances in which the wrong size tapping plates were picked by the warehouse and delivered to fiberglass. The 3 customer requirements were defined as having the correct tapping plates for each boat available on time, at the point of use. Measure To understand the process in a visual way, the team completed a value stream map of the process Value stream mapping (VSM) is a tool that uses a flowchart to document each step in a process (ASQ, 2022). In this step we created the current-state map. We looked at each step in the process and mapped how material and communication flowed throughout. We then put together a data collection plan. As we were under pressure to resolve the issues quickly, we decided om a two- week window for data collection. The warehouse was given a sheet to document the orders they placed with the weld shop and document the time to order fulfillment. The fiberglass supervisor was given a log to track how many stock-out instances there were in the time frame and how much time was lost due to them. The driver was given a log to track how many additional trips were required