• Home
  • Southern New Hampshire University
  • Network Defense CYB-310-T5690
  • Network Reconfiguration Planning and Future State Design

Network Reconfiguration Planning and Future State Design

Southern New Hampshire University CYB 310 Network Reconfiguration Planning Template Current Network State Sales Department · 3 PCs · 1 switch Subnet 2 Department · 3 PCs . 1 switch Network 3 Department · 4 PCS · 1 switch Server Network 3 · 1 PC · 1 switch Server Main PC · 1 server main PC Backbone (Network Device Infrastructure) · Sales switch is connected to switch0 . Subnet 2 switch is connected to pfsense4-2 . Network 3 switch is connected to pfsense4-3 and R2 . Server Network 3 switch is connected to R2 . Server Main PC is connected to R1 . Pfsense4-2 is connected to switch0 · Pfsense4-3 is connected to switch0 · R1 is connected to switch0 . Switch0 is connected to pfsense4-1 . Pfsense4-1 connected to the internet Network Reconfiguration (Future State) Customer Experience Department · < Identify the number of PC(s)> · < Identify the number of switch(es)> HR Department · < Identify the number of PC(s)> · < Identify the number of switch(es)> Network Servers · < Identify the number of server(s)> · < Identify the number of switch(es)> · < Identify the number of router(s)> Backbone (Network Device Infrastructure) <Using the example for the current state, determine the network connections of your future state network reconfiguration.>