A person pulls a toboggan for a distance of $35.0 \mathrm{m}$ along the snow with a rope directed $25.0^{\circ}$ above the snow. The tension in the rope is $94.0 \mathrm{N} .$ (a) How much work is done on the toboggan by the tension force? (b) How much work is done if the same tension is directed parallel to the snow?