According to a spokesperson for Pacific Gas \& Electric Company, the Tiger Creek plant, located east of Jackson, California, is one of 71 PG\&E hydroelectric powerplants. The plant has $373 \mathrm{m}$ of gross head, consumes $21 \mathrm{m}^{3} / \mathrm{s}$ of water, is rated at $60 \mathrm{MW}$, and operates at $58 \mathrm{MW}$. The plant is claimed to produce $0.785 \mathrm{kW} \cdot \mathrm{hr} /\left(\mathrm{m}^{2} \cdot \mathrm{m}\right)$ of water and $336.4 \times 10^{6} \mathrm{kW} \cdot \mathrm{hr} / \mathrm{yr}$ of operation. Estimate the net head at the site, the turbine specific speed, and its efficiency. Comment on the internal consistency of these data.