Rough-Cut Capacity Planning
Figure 13.7.3.1 shows the network plan for a production order.
(GRAPH CANT COPY)
Fig. 13.7.3.1 Rough-cut network plan with two rough-cut work centers.
a. Complete the network plan: Calculate the earliest start date and the latest start date for each operation. What is the lead-time margin (the slack time), and what is the critical path? Determine the slack of all operations not on the critical path.
b. Following the technique introduced in Section 13.4.1, determine the resource profiles for rough-cut work centers 1 and 2, as well as the resource profile for the combination of rough-cut work centers 1 and 2 .
c. Figure 13.7.3.2 shows the preload of rough-cut work center 2. Load the resource profile for rough-cut work center 2 with infinite loading. Determine the earliest completion date for the operations of rough-cut work center 2 . Further, determine the load and the deferred earliest completion date for the operations of rough-cut work center 2 without overloading the capacities.
(COLUMN CANT COPY)