Suppose Uptight Fawcett has a batch computer system that can be modeled by the cyclic computer model outlined in Exercise 14 . Suppose the mean CPU burst time is 0.02 seconds, the mean $I / O$ service time is 0.04 seconds, the mean number of CPU bursts required per job is 18.5 , and the multiprogramming level is 10 . What is
(a) the mean throughput, $\lambda$,
(b) mean turnaround time, $W$,
(c) CPU utilization, $\rho_1$, and
(d) the $I / O$ utilization, $\rho_2$ ?