3.
If the sea power plant described in Problem 2 is to deliver power at $8/10$^6$ Btu, estimate the maximum
permissible cost of the condenser and evaporator heat-exchanger surface in dollars per square foot, assuming a
20-year life, 10% discount rate, and 7% yearly fuel inflation. (10 points)