I need help on how to fill out this table. Steps would be appreciated.
34 We are trying to set up MRP for components of our main product A. Based on the product structure shown below, fill out the table. A is made of: 28, 2C, 4F. 2C is made of 3D, 3E. C1 is made of 4F, 50, 2E.
Infol period 2 8 9 10
Part 1 3 4 5 6
GR 300 600 A A0 RO 20 Zopeay
Available 70 70 30 - - -
1o=50 Sch. Receipt S8O SS=30 Net Req. 100 000 Lot=SO PO Receipt 300 PO Release 300 GR 600 12.00 8
Lead-1 Available 26 20 20 0 0 - - - -
20 Sch. Receipt 1200 SS=0 NR Lote4 PO Receipt 12-00 PO Release 13.00 C GR L00 0 0 1200
Lead-2 Available 0 - - - 40-0 Sch. Receipt . - 12.96 S5=50 Net Req. G00 Lot=100+ PO Receipt GOO 1260 PO Release GOO 3000 300 GR 1741
D Lead-2 Available 80 o=100 Sch. Receipt SS=20 Net Req. Lot=1 PO Receipt PO Release
E GR Available 80 Lead-1 =100 Sch. Receipt SS=20 Net Req. 05=107 PO Receipt PO Release
F GR Available 5 Lead=1 1=5 Sch. Receipt SS=0 Net Req. Lot=10 PO Receipt PO Release