Cicilia telecom raised an incident and had to invoke disaster recovery as one of their critical systems had excess CPU utilization. After taking support from OEM, and ensuring CPU utilization is at an acceptable level, operation was shifted back to the primary site. Which type of control was executed here?
SELECT THE CORRECT ANSWER
Preventive control
Corrective control
Detective control
Compensating control