13.Wiley Tire Manufacturers produces two types of tires: Economy and Premium. The included output lays out all of the details of the production process. Which solution is infeasible? Consider the solutions: (406.45, 116.13), (0, 350). (294.64,414.29), (350,0)
Wiley Tire Manufacturers
Parameters
Time Available Manufacturing Time (Hours) Hours Economy tires Premium tires 0.50 GOO Operation Material Preparation 1.33 1.00 650 0.80 Tire Building 0.50 580 0.50 0.33 120 Curing 0.20 Final Inspection 12 VT 10 Profit per Tire
Model Tires Produced
Economy 1
Premium 1
Time Used Time Available Operation 1.83 600 Material Preparation 1.80 650 Tire Building 1.00 580 Curing 0.53 120 Final Inspection S 22.00 Profit
Let E=number of economy tires manufactured P=number of premium tires manufactured Max12E+10P s.t. 4/3E+1/2P600-Material Preparation 4/5E+P650-Tire Building 1/2E+2/4P580-Curing 1/5E+1/3P120-Final Inspection
E,P0
O (E=406.45, P=116.13)
OE=0P=350 O (E =294.64, P = 414.29)
OE=350,P=0
O All solutions are feasible