We produce 2mm 3003-H14, 3mm thick plate in the factory. The purchasing department
has been asked to enter the factory after 6mm 3003-F plate was procured and this product
was after the input control.
a) As a Metallurgical Engineer working in the Quality Control department, your first
task is to decide whether this product is suitable for producing 2mm 3003-H14.
Which characterizations do you need to make in order to approve or reject this
product. Indicate in detail how the samples should be taken, how they should be
prepared, which characterizations should be done, why and under which
conditions, and according to which standards?
b) Your second task is to perform process quality controls. It is known that in the
production route of this product, homogeneous annealing at 6mm-4mm rolling-
450C-4 hours annealing -2mm rolling. In each step, specify in detail how samples
should be taken for quality control of this material, how they should be prepared,
which characterizations should be made, why and under which conditions,
according to which standards?
c) Your third task is to do their final checks. For this purpose, please specify in detail
how samples should be taken, how they should be prepared, what
characterizations should be done, why and under which conditions, according to
which standards, by referring to the requirements specified in the standards for
2mm 3003-H14?