I need the solution for 7-11, thank you.
7-7 to 7-16.
A preliminary design of the shaft by performing the following tasks:
1. Specify a suitable material for the shaft.
2. Check for yielding.
3. Sketch the shaft to scale, showing all proposed dimensions.
Make appropriate changes to bring them all within the limits.
Problem Number Original Problem, Page Number
0 lm 2 7-7* 3-68, 151
teo me golovs00 78* 369, 151
motin(d zonlg! 7-9* 7-10* 3-71, 151
(.0 7-11* 3-72, 152
16-DE 7-12* 3-73, 152
7-13* 3-74, 152
7-14* 06001 3-76, 153
7-15* 3-77, 153
7-16* 3-79-153