A static pipeline can perform only one operation. In an operation, a Negative Going
Transition-triggered latch (L) has a propagation delay of 2 ns and the functional
logic 1 (FL1) has a propagation delay of 16 ns. The maximum operating frequency
of the pipeline is 50 MHz. Based on the information, illustrate the operation using
a timing diagram. The timing diagram should include Clock, NGT-triggered Latch,
and functional logic 1 and 2.