OPEN BOOK EXAM
In the HDA process, V-102 is to be replaced by a new one with internal cooling coil and with extra layer
of demister. Also, the operating design pressure is to be doubled. As a process engineer who is
responsible for preparing and updating the HDA PFD, the correct name and number of this vessel
should be:
a. V-102A.
b. V-102.
c. T-102.
d. TK-102.