Activity List
Activity List
Depend Upon
Duration Machine
1
Strip room
3
-
2
Repair wall and ceiling
1, 5, 7
4
1
3 Repair floor
1, 5
1
-
4 Lay vinyl floor
3, 12, 13, 14
1
-
5 Rough in plumbing and
1
5
1
electrical
6 Finish in plumbing and
electrical
2, 3, 5, 9, 10, 11, 19
2
1
7 Replace existing fume duct
1
3
8
Install new fume hood
2, 3, 16
1
1
9 Install 1/3 base cabinet
2, 3, 8, 15
1
1
10 Install wall cabinet
2, 3, 7, 15
5
1
11 Install chemical sink
2, 3, 5, 9, 17
1
1
12 Paint cabinets
6, 8, 9, 10, 11, 18
6
13 Paint walls and ceiling
2, 3, 6, 8, 9, 10, 18
3
14 Obtain vinyl floor covering
-
5
15 Obtain cabinet
-
10
16 Obtain fume hood
-
10
17 Obtain chemical sink
-
10
18 Painter availability
-
20
19 Install 2/3 base cabinet
2, 3, 9, 15
2