At an activity level of 8,500 machine-hours in a month, A Corporation's total variable production engineering cost is $748,850 and its total fixed production engineering cost is $177,760. What would be the total production engineering cost per machine-hour, both fixed and variable, at an activity level of 8,800 machine-hours in a month? Assume that this level of activity is within the relevant: range.
Note: Round intermediate calculations to 2 decimal places.