00:01
Some reminders about working with circuits, with resistors.
00:06
A main equation to work with is omslaw that says that the voltage across a resistor is the product of the current through it times its resistance.
00:23
The other quantity to work with often is the power dissipated by a resistor, and that is given by i squared times r.
00:37
We can also work with the power lost or generated by any device if we multiply the current through it times the voltage across it.
00:49
So let's take a look at a simple circuit.
00:53
There are eight bulbs in parallel that we will lump together as r equivalent is the idea of treating them as one single circuit.
01:03
Resistance.
01:05
They are in series, which means the same current through everything, with two leads that lead back to a 120 -volt battery.
01:17
The leads each have 1 .4 oms in them.
01:21
We know the current, and now we need to find the resistance of each bulb.
01:28
So we'll put that as our goal.
01:31
The resistance of each bulb.
01:34
What is that? and there are several ways to do this, but i would probably want to find the voltage difference across our equivalent and then use oms law.
01:49
So let's take that as our tactic.
01:51
Find v across our equivalent, then use oms law.
02:03
So finding the voltage across the r equivalent is we can use a loop equation if we wanted to, that there is a 120 volt gain if we start, say, at one point on the circuit, point a, and we start to move around it.
02:27
Then we have a loss of 0 .21 amps times 1 .4 oms.
02:39
Then another loss of that same amperage times the r equivalent.
02:48
And then finally, a second drop from the second resistor, the second lead resistor.
02:57
And all those must add up to zero by the time we've come all the way back.
03:02
To our initial point.
03:04
So that's known as a loop equation coming from conservation of energy.
03:12
But we can use that to solve for both the voltage across the r equivalent is this piece.
03:29
And furthermore, we can break that into i current in amps times r equivalent and solve that.
03:40
So what we have basically is, let me check my numbers real quick.
04:03
So the voltage across the r equivalent, that is what i want to solve for first.
04:22
And yes, this whole bunch is 119 .4 volts.
04:29
And we'll put everything on the other side...