maximum capacity of 175 kg water evaporated/s.
evaporator, and the crystallizer. Then write in an efficient order (minimizing simultaneous
equation, circle the variable for which you would solve, but don't do the calculations. b Calculate the maximum production rate of solid KSO4, the rate at which fresh feed must be supplied to achieve this production rate, and the ratio kg recycle/kg fresh feed. c Calculate the composition and feed rate of the stream entering the crystallizer if the process is scaled to 75% of its maximum capacity. d The wet filter cake is subjected to another operation after leaving the filter. Suggest what it might be. Also, list what you think the principal operating costs for this process might be. e Use an equation-solving computer program to solve the equations derived in Part (a. Verify that you get the same solutions determined in Part (b).