No handwritten. Please use the keyboard. I need the answer in 30-40 minutes. Please give me the answer as soon as possible.
If you can give me the answer in time, I will give you a positive rating without hesitation. Thank you!
2. Variances (10 marks)
Data
Budgeted
Actual
Output Variable MO/H
2,200
2,500
$8,300
$8,800
Fixed MO/H
$8,000
$8,200
Standard hours allowed: 2 direct labor hours per unit
Actual hours used: 4,500 direct labor hours
The allocation base for both variable costs and fixed costs is direct labor hours
Required:
a. Calculate the standard variable overhead rate
b. Calculate the variable overhead variances including spending variances, efficiency variance, and flexible variable overhead budget variance
c. Calculate the standard fixed overhead rate
d. Calculate the fixed overhead variances including spending variances, production volume variances, and fixed manufacturing overhead variances.