00:01
This tells us that a bolt is dropped.
00:04
So that means the initial velocity is zero.
00:08
It falls 90 meters.
00:10
So that means the initial height is 90.
00:18
How long does it take to get to 20 %? no, the last.
00:23
How much time does it take to pass through the last 20 % of its fall? okay.
00:29
Well, let's do v.
00:42
Equals v initial, which is zero plus g t.
00:49
So the final velocity is going to be g times t.
01:01
It may be going about this in a roundabout way, but let's see.
01:07
Oh, but i don't know t.
01:09
So that would be a roundabout way.
01:14
B squared equals v initial squared, which still might be around about, minus 2a times y.
01:24
Okay, the final velocity is just going to be the square root of 2gy.
01:36
Okay, v equals square root of 2g times y, which was 90.
01:50
Okay, so that's going to be 42 points.
01:52
Zero meters per second.
01:57
Now, last 20 % of its fall, i need height.
02:04
So, but wait a minute, v squared equals, again, the initial squared, it'll be the square root of 2gy, but this time i want to do 20 % of y.
02:39
So now let's try this way.
02:41
I'm going to call this v sub 20 is square root of 2g.
02:53
Oh, but it's the last 20%...