Calculate the work done on the tool by $\vec{F}$ of the tool is first moved out along the $x$-axis to the point $x=3.00 \mathrm{~m}, y=0$ and then moved parallel to the $y$-axis to $x=3.00 \mathrm{~m}, y=3.00 \mathrm{~m}$
(A) $67.5 \mathrm{~J}$
(B) $85 \mathrm{~J}$
(C) $102 \mathrm{~J}$
(D) $7.5 \mathrm{~J}$