00:01
In this question we are given that the analyst in the doorband company which is to assign a number of like machines to an operator based on minimizing the cost per unit of output.
00:12
And we are given detailed study.
00:15
So loading machine standard time is 0 .34 minutes.
00:18
Unloading machine standard time is 0 .26 minute.
00:21
Walk time between two machines is 0 .06 minutes.
00:25
Power feed time is 1 .48 minute.
00:28
And we are also given operator cost.
00:30
And machine cost respectively $12 per hour and $18 per hour.
00:36
And we are asked that how many of these machines should be assigned to each operator if we want to minimize the cost per unit produce.
00:46
So first of all, we should understand that these two combinedly called l, that means loading and unloading machine standard time.
00:58
So now power feed time is defined as a small m...